360-Degree Price Check in Build-up unit rate
Background:
Build-up is the core task in cost estimation.
Data in Build-up will be adopted in all modules of TBQ C.
To facilitate a faster price data locating and checking process, the Check group is added in this module.
As a result, the frequently reflected scenarios by our users are solved.
Scenario 1
Users hope to see which rates are (not) adopted in BQ in order to check whether there is a missed use.
Scenario 2
Users hope to see for which bill items a rate is adopted to check whether they are right.
Scenario 3
Users hope to see which basic price is used to compose unit rate in BUR, so as to check whether there is a missed use.
Scenario 4
For a unit rate comprising basic rates, users want to see for which unit rates a basic rate is adopted, so as to check whether they are correct.
The [Check group] is added in Build-up module.
Show Ref Mark
Click the button, the reference marks will be displayed in the Build-up module.
For unit rates, the marks “BQ” are added to those that are adopted in bill items.
For basic rates (the Composite Material/Labor, Material, Labor, Equipment and Others), the marks “BQ” are added when they are adopted in bill items. And “UR” is added when they are adopted in unit rates.
Hide Ref Mark
Click the button to hide reference marks in Build-up.
Refresh Ref Mark
Click the button and all reference marks will be refreshed to the latest status.
Check Linking Rate
The reference mark of “UR” helps users to distinguish which rates are adopted in unit rates.
Click the mark, or select a rate with mark and click [Check Linking Rate], then a new window will pop up showing all unit rates with the selected rate.
Check BQ Reversely
The reference mark of “BQ” helps users to distinguish which rates are adopted in bill items.
Click the mark, or select a rate with mark and click [Check BQ Reversely], then a new window will pop up showing all bill items with the selected rate.